<html><body><br><div>I think this would be a very beneficial project.  If we have 6 lathes, we would 6 separate outlets, preferably on separate circuits.  We run into problems with multiple lathes on GFI outlets.  The setup we have at A-Line uses a 60 Amp 220 volt circuit.  I have had up to 8 lathes on it with no problems.  If we are talking 6 lathes and grinder, we would need something/someone to transport them.  The lathes I have at A-Line weight about 150 lbs apiece.  There are quite a few logistical issues which need to be worked out.</div><div><br></div><div>Duane</div><div class="reply-new-signature"></div><p>-----------------------------------------</p>From: "James Bloomer" <marine9096@gmail.com><br>To: crw-talk@crwoodturner.com<br>Cc: <br>Sent: Wednesday January 23 2019 12:33:33PM<br>Subject: [crw-talk] Proposal for Ft McCoy<br><br>
<div dir="ltr">
 Good afternoon, I was able to speak to Ft McCoy about trying for a Demo/hands-on event on post. I was asked to write up an informal proposal for them to look at. I have drafted this rough proposal and ask for any additions or revisions needed since I have not had a chance to participate in a demo, so I may be missing a piece or two. Please suggest your revision on the thread versus the attachment so I don't have multiple version floating about. 
 <div>
  <br>
 </div>
 <div>
  Many Thanks<br style="clear: both;">
  <div>
   <br>
  </div>
  -- <br>
  <div class="gmail_signature" dir="ltr">
   <div>
    James A. Bloomer
   </div>
   <div>
     
   </div>
  </div>
 </div>
</div>
 </marine9096@gmail.com></body></html>